Design and Construction - Retirement Village

Design and Construction of 35 independent living units for seniors (duplexes) Stage 5, 6, 7 The Parks, including civil works, road construction and landscaping.

More info


Cairns Corporate Tower Ground Floor Bathroom Refurbishment

Demolish and rebuild ground floor public and tenant amenities

More info


Commercial Warehouse - Frozen Storage Facility

Design and Construction of tilt wall structure and commercial cold storage facility including vehicular loading bay and loading equipment.

More info


Commercial Extension/Renovation Cairns

This project involved the extension of a commercial lease property, as well as, renovations to the existing properties exterior. The plans were designed & prepared by a local architect. The building required to be accessible for disabled and ambulant patrons which required compliance with AS1428.

More info


Building 71 _ Heritage Building Refurbishment

This project was completed through Serco Sodexo Defence Services for the Department of Defence Australia. The project involved stripping the original building back to bare structure and transforming the building to bring it into the 21st Century whilst retaining its heritage facade.

More info


Aboriginal & Islanders Alcohol Relief Services Ltd

This project was a commercial refurbishment of an old indigenous rehabilitation complex consisting of a number of buildings constructed in the 1970's in Mareeba. The client was Indigenous Business Australia, who required a refurbishment of the buildings before the complex changed its function.

More info


Many Peaks Radar Towers

This project was completed for the Australian Defence Force and required the demolition of existing non compliant towers, then supplying and erected new compliant towers in their place. A temporary tower was required to ensure that communications remain operational throughout the project.

More info


Communications Tower & Guyed Mast Tower Daunia Mine

Neater Commercial Constructions (NCC) was contracted to for the tower installation of a proprietary supplied 60M freestanding communications tower and 60M guyed mast tower for Daunia Mine

More info


Atherton Hospital CT Scan Extension Stage 1 & 2

Construction of the Stage 1 and 2 Atherton Hospital CT Extension. The works included the ground works, base and columns, suspended slab, brickwork, fire services and lockup of the CT scanner extension.

More info


Malanda Wastewater Control Building

This project involved the construction of a control building with set downs and bunded generator room for the Tablelands Regional Council's Malanda wastewater treatment plant. One of the major challenges of this project was the ability to complete the project during the annual wet season.

More info


Aquarius Rooftop Membrane

This project involved the removal of the existing waterproofing which was failing, and replacing it with a new waterproofing system to prevent water ingress from the roof.

More info


Unit Complex Extensive Rebuild

Remediation to the Cyclone Devastated Unit Complex. The existing beachfront unit complex was significantly inundated by the tidal surge and debris during cyclone Yasi 2011. Works included the complete reinstatement of the complex and facilities.

More info


Tully STARSN Tower

This project involved the replacement of a guyed mast tower damaged during Cyclone Yasi, and replacing it with a 46M Free Standing tower. Constructions works included removal of the old guyed tower, geotechincal engineering, footing construction and tower erection.

More info